Kinross Gold (Echo Bay) Slurry Plant

 

Location

Kinross Gold
Lamefoot Mine
Republic, Washington, USA

SIZE / CAPACITY
20 m3/hr

SERVICES PROVIDED

  • Conceptual Design
  • Structural/Mechanical Engineering
  • Design & Supply of Control System
  • Supply/Fabrication of all Equipment
  • Supervision of Equipment Installation
  • Commissioning and Training

SUPPLIED EQUIPMENT

  • 100 Gallon Receiving Tank
  • Cement Weigh Hopper
  • Water Weigh Hopper
  • 680 Liter Colloidal Mixer
  • Dust Collection System
  • Two Screw Conveyors
  • MCC/PLC Control System
  • Pneumatic Control System
  • Cement Silo
  • Support Structures and Platforms
  • Slurry Spray Bar

Located in northeast Washington State, this gold mine utilizes a Thiessen Tornado CRF (cement rock fill) plant underground. Located near the mine portal, this plant features a high shear colloidal mixer and is capable of running unattended when activated remotely. This system, developed by Team Mixing Technologies is totally self-cleaning and is controlled by a Modicon PLC and touchscreen.

This plant features an automated dust collecting system. A 110 ton cement storage silo, located on the surface automatically refills the underground silo when required. A feeder and cement blower is utilized for pneumatic conveying of cement.

Following the successful service at the Lamefoot mine, the plant was relocated to the nearby K2 minesite.