Lafarge Earle Creek

 

Location

Lafarge Construction Materials
Earle Creek Plant
Earle Creek, BC, Canada

SIZE / CAPACITY
500 Tons per Hour

SERVICES PROVIDED

  • Struct./Mech. Engineering
  • Supply/Fabrication of all Equipment
  • Equipment Assembly and Installation
  • Commissioning and Training

SUPPLIED EQUIPMENT

  • Hoppers
  • Wet Screen Discharge Chute
  • Screen Feed Chute
  • Sand Fume Chute
  • Wet Screen Hopper Box
  • Pump Box & Channel
  • Structural Steel Screen Tower
  • Conveyor Support Steel
  • Chuting for all Conveyor Transfer Points

Lafarge Construction Materials operates a large gravel pit at Earle Creek on B.C.’s sunshine coast. The nominal production rate at this plant, which includes aggregate screening and washing is 500 TPH. Coastal British Columbia is reputed to have some of the finest construction aggregate in the world.

Lafarge contracted Team Mixing Technologies for the fabrication of the steelwork including structural steel, chutes, bents, and catwalks. Also included in the scope of work was complete field installation of this large project. Barges are loaded via conveyor at this salt-water loadout facility and ply their way to the more populated areas of southwest B.C.

TMT employees enjoyed the daily water taxi rides to and from the site in what is one of the most picturesque sites we have worked at.