Newmont Deep Post Slurry

 

Location

Newmont Mining Corporation
Deep Post Mine
Carlin, Nevada, USA

SIZE / CAPACITY
7.5 m3/hr 

SERVICES PROVIDED

  • Conceptual Design
  • Structural/Mechanical Engineering
  • Design & Supply of Control System
  • Supply/Fabrication of all Equipment
  • Supervision of Equipment Installation
  • Commissioning and Training

SUPPLIED EQUIPMENT

  • 1350 liter Colloidal Mixer
  • Screw Conveyor
  • Slurry Dispensing Head
  • Silo Cone Modifications
  • PLC/MCC System
  • Pneumatic Control System
  • All Required Piping and Valves

As part of a larger underground backfill system, Team Mixing Technologies designed a compact TMT Tornado 1350 slurry system supplied by a cement silo provided by Newmont Mining Corporation.

This plant supplies cementitious slurry to haul trucks loaded with aggregate on surface for initial backfill production, while construction of the main backfill plant underground is undertaken.

The slurry system was designed to work in three distinct modes. Initially, slurry was supplied on surface. The plant was then relocated and integrated into the main backfill system underground, to pre-slurry cement for the 6 cubic yard compulsory mixer. Thirdly, the backfill system has been designed to allow the slurry plant to again function as an independent slurry plant, when required.