JDMT (TBM Grout Plant)

 

Location

JayDee Contractors/Michels Pipeline Construction/Traylor Bros JV
BWARI Sewer Project
Columbus, Ohio, USA

SIZE / CAPACITY
7.5 m3/hr Grout
12 m3/hr Bentonite

SERVICES PROVIDED

  • Conceptual Design
  • Structural/Mechanical Engineering
  • Design & Supply of Control System
  • Supply/Fabrication of all Equipment
  • Supervision of Equipment Installation
  • Commissioning and Training

SUPPLIED EQUIPMENT

  • 600 & 1500 litre Colloidal Mixers
  • 1200 litre Agitation Tank
  • 5500 litre Bentonite Hydration Tank
  • Two Mocol High Pressure Grout Pumps
  • Admix Dispensing System
  • Two Water Delivery Systems
  • Two Bentonite Weigh Hoppers
  • Three 2100 cu.ft. Storage Silos
  • Four Screw Conveyors
  • Two Modified 20’ Insulated Containers
  • Two Motor Control Centers
  • Automated PLC/MCC Control System

The BWARI or Big Walnut Augmentation/ Rickenbacker Interceptor Sewer Project is being undertaken to increase the capacity of the existing wastewater collection system along the Big Walnut, Blacklick and Alum Creek basins in eastern Columbus and Franklin County, Ohio. The first phase of the project includes approximately 4 miles of 14 ft diameter tunnel using a Lovat Earth Pressure Balance (EPBM) tunnel boring machine.

Team Mixing Technologies was contracted to design and commission an automated batch plant to produce cementitious grout for back-grouting concrete segments plus a hydrated bentonite plant for soil conditioning and TBM lubrication, both constructed within insulated steel containers. Three storage silos supply bulk materials to the grout plant as well as bentonite to the bentonite plant.